1
2
3
4
5
164
TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine
— 05-06/2013
1. Each individual LNB holder is checked
for precision. A small hammer is used
by an employee until the holder is
exactly aligned to the measuring bar and
vertically clicks into place in the lower
notch.
2. Checking the bend radius of the LNB
holder.
3. The mounting parts are re-worked
manually until they meet all
specifications.
4. Each individual mounting clamp is
thoroughly checked and re-worked, if
necessary.
5. A female worker assembling the
screws of the mounting system.
6. Checking the wall holder. A wooden
hammer is used to manually correct any
imperfections.
7. These gauges are used to check the
correct angle of the wall holder.
8. Quality assurance: No component
goes unchecked.
Quality Assurance
at LIANXING
1...,154,155,156,157,158,159,160,161,162,163 165,166,167,168,169,170,171,172,173,174,...228